quantity of materials required for rcc slab

  • How much material is required for 50'*30'*6' RCC slab

    So total Quantity of materials required for that slab is. Cement = 400*21.3 = 8520 kg/m3 = 170bags. Sand = 600*21.3 = 12780kg = 12780/35.28 = 362Cft. Coarse Aggregate= 1200*21.3 = 25560kg = 724Cft. Steel Quantity is manly Depends Bar-bending Schedule as per design consultants. For a slab, as a thumb rule,minimum reinforcement required is 7kg/m2

    Chat Online
  • Quantity and Rate Analysis for Reinforced Concrete

    21.08.2014· Data required for RCC Rate Analysis: 1. Estimation of materials: Material estimation include sand, cement, coarse aggregate and steel for a particular mix design. Let us consider a mix design of 1:1.5:3 for our estimation practice. The dry volume of total materials required is considered as 1.54 times the wet volume of concrete, due to voids present in sand and aggregates in dry stage. Therefore, for

    Chat Online
  • Cost and quantity calculation for RCC slab of 2 dismil

    Weight calculation of Steel for slab. quantity of steel required in roof slab is about 0.5℅ to 1% of dry volume then average is 0.75% of dry volume Weight =0.75%of dry volume×density of steel Density of steel is=7850 kg/m3 W =0.75/100×16.724m3 ×7850kg/m3 Weight=984.625kg

    Chat Online
  • List of Materials Used in Reinforced Cement Concrete (R.C

    Following four materials are required for making R.C.C.: 1. Cement 2. Aggregates 3. Steel 4.

    Chat Online
  • Cement Concrete Calculator PCC Calculator RCC

    The proportions of materials (cement, sand, coarse aggregate) for nominal mix/design mix concrete that are normally used are 1:3:6 or 1:4:8. As strength. RCC or Reinforced Cement Concrete is strengthening of Cement concrete by adding mild steel bars in it. There are two types of steel bar; round and torsion. The various elements of RCC construction are foundation, beam, column and slab. These can be

    Chat Online
  • Specifications for RCC Construction Building Estimating

    For cement concrete of ratio 1:2:4 require 6 no bags of 50kg. For cement concrete of ratio 1:3:6 require 4.25no bags of 50kg. For cement concrete of ratio 1:4:8 require 3.2 no bags of 50kg. For cement concrete of ratio 1:5:10 require 2.50 no bags of 50kg.

    Chat Online
  • quantity of materials required for rcc slab

    Home / quantity of materials required for rcc slab. How can I calculate the amount of concrete required for a ,, To calculate the cost of concrete required for slab shall be done by following steps Total Cost = Labour Cost + Material Cost + Plant Cost a) Labour Cost shall be calculated based on the no of different categorized manpower required to perform a job and their daily wagHow to measure

    Chat Online
  • What's the quantity of steel, cement and sand for 1100

    For M20 grade (1:1.5:3) as per mix design the quantity of material required is Cement = 400kg/m3, Total Cement required for that concrete is = 400*12.8 = 5120Kg = 5120/50 = 103Bags Sand = 600 kg,

    Chat Online
  • Concrete Calculator -Calculate Slab, Beam, Column, Footing

    22.11.2017· This Concrete Calculator calculates quantities of materials required for construction of concrete slabs, beams, columns, footings and trapezoidal footings in cubic meters and cubic feet. The quantity of cement, sand and aggregates for various proportions of concrete such as M10 (1:3:6),

    Chat Online
  • Quantity Of Cement, Sand, & Aggregates For 1000 sq ft Slab

    26.06.2018· Cement, Sand, & Aggregates For 1000 sq ft Slab: To calculate the quantity of cement, sand, and aggregates required for a flat slab first we need to calculate the volume. Area of flat slab = 1000 sq.ft =93 sq. m. The minimum thickness provided for the slab is 150 mm.( According to IS 456) 150 mm = 0.15 metres. Hence Wet volume = Area of slab x Thickness of slab. Wet volume = 93 x 0.15 =

    Chat Online
  • How much material is required for 50'*30'*6' RCC slab

    If you want concrete quantity means you just multiply dimension of the slab,(LxBxD) you will get it in Cum. or else If you want individual items quantity (cement, sand, aggregate), here you have to do Mix design calculations then only you will get...

    Chat Online
  • Specifications for RCC Construction Building

    I need to find out per sqft cost of monolithic construction including the quantity of material included and labour details. I want to construct a rcc slab from main road to my house. It will be sloped. It’s length is 41ft and width is 7ft. So, how I estimate. That means what amount of steel, sand and stone or brick chips do I required. Slab thickness is 4 inch. Reply. Vishnu. May 29

    Chat Online
  • Materials Estimation For Circular RCC Water Tank

    Total volume of RCC work = RCC water tank wall volume + water tank slab volume + Foundation RCC volume. Total RCC volume for water tank = 7.28 + 2.206 + 6.61 = 16 m3 . Steel Volume for water tank = 2% of RCC volume. Steel volume = 2/100 x 16 = 0.32 m3. Now Different Materials Quantity. Total volume of RCC works. Convert Wet RCC volume to Dry materials. Dry volume = wet volume x 1.54 =

    Chat Online
  • How to Calculate Steel in RCC Slab CivilJungle

    BBS for Slab-Bar bending schedule or bbs plays a significant role in estimating the quantity of steel for beams, columns, and slab.It helps to find out bar shape, size, length, weight, bending dimension, etc. In two way slab, the slab is supported by four sides and loads are carried along with both directions.. How to Calculate Steel Quantity for Slab:

    Chat Online
  • i want to know about the raw material quantity for the

    The quantity of materials required for RCC roof for 2000 sq ft and 4.5'' thick with the ratio 1;2;4 is as under 1 cement= 130 bags 2 Coarse sand=350 cft 3. Bazri= 675 cft 4 MS Steel bars= 1700kg to 1900 kg : Sat Oct 25, 2014: Post #2: JAI PRAKASH Join date: May 2014: Cement = 140 bags Dust: 300 ft. Rodi: 600 ft. Saria: 3000 kg (Includes all beams, stairs and roof) Wed Nov 05, 2014: Post #3

    Chat Online
  • How To Calculate Steel Quantity For Slab Excel Sheet

    As we think that calculating steel quantity for the slab is a too difficult task, it required good skills in civil engineering. but I am sharing with you an excel sheet, which will make slab steel quantity calculation too easy for anyone who wants to know the exact quantity of steel required for his/her slab.

    Chat Online
  • How to Calculate the Quantity of shuttering for slabs

    22.10.2017· Suppose we have a covered area is 200o square feet and over there we need to construct the R.C.C slab. So we need to calculate the quantity to tell the contractor. 1. To calculate the quantity of Shuttering Plywood, Nails, Shuttering oil, clamps etc.? Given Data: Covered Area = 2,000 square foot. Shuttering type = Wooden The quantity of

    Chat Online
  • Quantity Of Cement, Sand, & Aggregates For 1000 sq ft

    Cement, Sand, & Aggregates For 1000 sq ft Slab: To calculate the quantity of cement, sand, and aggregates required for a flat slab first we need to calculate the volume. Area of flat slab = 1000 sq.ft =93 sq. m. The minimum thickness provided for the slab is 150 mm.( According to IS 456) 150 mm = 0.15 metres. Hence Wet volume = Area of slab x Thickness of slab. Wet volume = 93 x 0.15 = 13.95

    Chat Online
  • Concrete Calculator Estimate Cement, Sand, Gravel

    Example calculation Estimate the quantity of cement, sand and stone aggregate required for 1 cubic meter of 1:2:4 concrete mix. Ans. Materials required are 7 nos. of 50 kg bag of cement, 0.42 m 3 of sand and 0.83 m 3 of stone aggregate.

    Chat Online
  • Quantity of Cement, Sand and Aggregates For 1000 sq ft

    The quantity of sand will be determined as follow :-Sand = 1.5 /5.5 x 18.17 = 4.95 cum. To convert it to cft, multiply with 174.80 cft. The quantity of aggregate will be determined as follow :-3/5.5 x 18.17 = 9.90 cum. To convert it to cft multiply it same as above i.e. 9.90 x 35.3147 = 349.60 cft. The quantity of steel will be determined as

    Chat Online